代写-实时项目的驱动管理

by | 23-Jul-2019 | 美国代写

本篇代写-实时项目的驱动管理讲了在实时项目的情况下,项目可以分为变化驱动型、市场驱动型和危机驱动型。在变更驱动的管理中,目标是根据驱动市场的变更和不确定性而变更的。这些变化是为了满足市场需求(Kerzner, 2013)。这些变化源于环境的变化。本篇代写文章由美国第一论文 Assignment First辅导网整理,供大家参考阅读。

In the case of real time projects the projects can be classified into change driven, market driven and crisis driven.

In the case of change driven management, the goals are changed according to the changes and uncertainty that is driving the markets. These are changed in order to meet the market requirements (Kerzner, 2013). The changes stem from the changes in the environment. For example, if there is new equipment that is used for the equipment changes

In the case of market driven projects there will be newer project that will be developed based on the market changes and demands of the consumer.

The next factor is the crisis driven projects. These kinds of crisis could stem from financial instability and market fluctuations. These can also include the changes or crisis from natural disasters such as tornado (Kerzner, 2013). For example, during the construction of the project, it is quite possible that the people must get hurt. In this system, the companies need to have the appropriate crisis system.

更多关于美国论文代写的内容,点开主页栏目,即可快速获取论文代写相关资讯,如果各位有代写论文需求,可以咨询我们网站客服,24小时在线为您详细解答。

相关的论文代写的话题